Always read the instruction manual for your tower before putting it up. A risk assessment should be carried out before any work at height.
Wind
Industrial towers (3T, AGR, 8-Rung, Fold Out):
- Above 7.7 m/s (17 mph), stop work and don't move the tower.
- If the wind may reach 11.3 m/s (25 mph), tie the tower to a rigid structure.
- If gale force (over 18 m/s / 40 mph) is likely, take the tower down.
Home Master DIY towers:
- Stop work and don't move the tower above 20 km/h.
- Tie it in if the wind may reach 31 km/h.
- Take it down if it may go over 52 km/h.
Putting it up
- Industrial towers should be put up by 2 people (the Stair Tower must be). The One Man Tower is designed for one person.
- Only build on firm, level ground. Lock the castors.
- Always fit outriggers or stabilisers when specified, set at about 45°.
- Ballast, if needed, must be solid (not water or loose sand) and placed on the lowest rung.
Using it
- Always climb on the inside of the tower, never the outside.
- Don't use braces as steps, and never stand on boxes, ladders or other objects on the platform.
- Adjustable legs are for levelling only, not for extra height.
- Don't lean ladders against the tower or bridge between the tower and a building.
- Don't go over the safe working load. Remember that tools and materials count.
Moving it
- Never move a tower with people, tools or materials on it.
- Industrial towers must be reduced to 4m or less before moving. Home Master towers above 5m working height must be taken down before moving.
- Raise outriggers only enough to clear the ground (25mm maximum on industrial towers).